Georgia Department of Transportation continues to improve highway infrastructure throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue through Sunday, Sept. 23.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.
Lane and road closures are scheduled as follows:
Bryan County
Highways 25/17 at Ogeechee River: Bridge Rehabilitation work will cause single-lane closures from 6 p.m. to 6 a.m. Tuesday-Sunday through Sept. 30.
Area construction
Interstate 95
- Work could be in Camden, Glynn, McIntosh,
Liberty, Bryan and Chatham counties
- Nightly intermittent single and/or double lane
closures from 7 p.m. until 7 a.m. for numerous projects consist of resurfacing,
ramp slab replacement, pavement markers installation and vegetation removal in
median
Interstate 16: Concrete pavement repairs will cause nightly lane closures from 7 p.m. to 6 a.m. intermittently from mileposts 149.5 to 166.
Interstate 516: Concrete repairs and grinding operations with ramp closures will cause east and westbound lane closures from 9 p.m. and 6 a.m. through Thursday from mileposts 0 to 6.2. Weekend closures will be from 9 p.m. Friday to 6 a.m. Monday.