By allowing ads to appear on this site, you support the local businesses who, in turn, support great journalism.
DOT: Construction continues on 144, 17, 95, 80, 21 ....
road work-barrels
The Georgia Department of Transportation continues to work on highway infrastructure throughout the area. 

Major projects of interest that will likely impact traffic are listed below. 


All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.
 
Bryan
Interstate 95 Friday night into Saturday morning contractors will replace damaged raised pavement markers (RPMs) southbound between mile 87 and mile 67 into Liberty County. Work hours are 9 p.m. until 2 a.m. Jan. 19.
                                                                                                                                                                       
Highway 144 Contractors will install closures in both directions between Charlies Road and Oxford Drive from 9 a.m. to 4 p.m. daily Monday through Wednesday, weather permitting. These closures allow utility relocation and drainage structure removal in the widening project area.    
                                                                   
HWY 17 Ponderosa Road ending at the Ogeechee River                                         
Single lane closures Monday through Sunday today through Jan. 30
7 p.m. to 6 a.m.

Bulloch
Highway 24 Clito Circle to Screven County line                                                                               
Daily closures Tuesday through Saturday from 7 a.m. to 7 p.m.

Chatham  
Jimmy Deloach Parkway beginning Friday between Prescott Road and Highway 80 the outside lane on the four-lane divided highway will close to perform tie-in work on the future south bound off-ramp for Jimmy DeLoach Parkway. The duration for this closure is set for a minimum one month in order to complete.

County Road 787 (Island Expressway) between Oatland Island Road to Elba Island Road Single Lane closures Monday through Friday 9 a.m. until 3 p.m.                                                                                                                                                                                  
US 80 between Stagecoach Road and Old Osteen Road
Lane shift with speed reduction required for Jimmy Deloach Extension Project

Highway 25 Conn/West Bay Street from I-516 to Bay Street Viaduct                                             
Traffic Shift on Bay Street between West Street and Tuten Street  to replace box culvert

Highway 21 Fries Road to Crossgate Road
Single Lane Closures for installing a Commercial Driveway and Turn Lane                           
Monday through Saturday 9 a.m. to 4 p.m. through March 31
                                            
HWY 17 closures beginning south of Ponderosa Road to South of Ogeechee Monday through Sunday 7 p.m. to 6 a.m. through Jan. 31

Effingham
Highway 275 at Rincon-Stillwell Road and Long Bridge Road storm drain installation closures     
Monday through Saturday 8 a.m. to 4 p.m.